Lamb Riggers hoist a 5,000 lb pizza oven through a 2nd story building to be rolled through the building and rigged into final position.
Man do we love pizza!
![]() |
![]() |
Lamb Riggers team up with Nauset Construction and Senior Engineers at Umass Amherst. This project entailed assembling, hoisting and rigging into place, Seven Fume Stacks atop one of the university�s research buildings.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Lamb Riggers extract a 25,000 lb magnet from Mass General Hospital’s Proton Therapy Center. The magnet was rigged through the hospital and out of a hatch in a Boston city street. A new magnet was also installed by Lamb.
Out with the old...
![]() |
![]() |
![]() |
![]() |
And in with the new...
![]() |
![]() |
Visit us on Google Places to learn about special offers, and review our service!